PortaPottyBossPro Blog — Construction Site Accounts

Winter Servicing of Construction Porta Potties: Cold-Weather Routes and Notes

Construction Does Not Stop for Winter

In many areas, builders keep working through the cold months. Crews still need units, and those units still need weekly service. But winter changes the job. Tanks and hand wash stations can freeze, sites turn to mud or ice, gates get drifted shut, and days are shorter. Routes that ran on time in summer run late in January.

The customer app, covered in Service Requests From the Customer App: Letting Contractors Order Extra Pump-Outs, lets supers request extra service when they need it. In winter, they may need it more, and your office needs to plan for slower, harder days.

Plan Shorter Routes

A truck that services thirty stops on a summer day may manage fewer in snow. Build that into the Scheduled List. Use the board's totals of stops and dollars per service to see how heavy each truck's day is, and spread construction stops across more days or more trucks when the weather turns.

Auto-routing, Closest First or Furthest First from the yard, helps keep drive time down. On a winter day, the order can matter even more: sites with plowed access early in the day, sites that thaw later in the afternoon. Dispatchers can drag stops into the order that fits conditions.

Winter Service Practices

Each company has its own cold-weather methods for keeping tanks and hand wash stations working, and the right approach depends on how cold it gets where you work. Whatever your method, put it in the job notes so every driver does it the same way. If certain sites need extra attention, such as a hand wash station that is prone to freezing, note it on that site.

Some companies pull hand wash stations from sites during the coldest months, or switch them for other options. If you do, schedule the pickup as its own job so the rental closes cleanly, and let the super know in advance by text.

Access Notes for Snow and Ice

Winter changes how drivers get into a site. A gate that opened fine in October may be blocked by a plow pile. The usual path to the units may be ice. Update access notes when conditions change:

Placement notes matter too. Units placed in a low spot can sit in meltwater, and units on the shady side of a building may stay frozen. If you can choose, a level, accessible spot that the plow will not bury is best. Job Site Access Notes: Gates, Lockboxes and Where the Porta Potties Go covers access notes in general.

Skips With a Reason

Some winter days the driver simply cannot reach the units. A site is snowed in, a road is closed, or the gate is frozen shut. When that happens, the driver taps Skip with a note explaining why. The office sees the reason, and the stop stays on the Waiting List so it gets picked up on the next possible day.

Weekly service is based on the minimum days between visits, so a late visit pushes the next one back automatically. The schedule adjusts without anyone rebuilding the calendar.

After a storm, the Waiting List map is the fastest way to see the damage to the week. Sites that were skipped show as due or overdue, colored by status. The dispatcher can sort out which construction sites need service first, usually the largest crews and the sites that were skipped twice, and assign them to the trucks that can reach them. Smaller sites that are only a day or two late can wait until the roads are clear.

Drivers should not take risks to reach a unit. A skip with a note is always better than a truck stuck in a muddy lot or sliding on an icy ramp. Make that clear to every driver before the first cold snap, so nobody feels pressure to finish a stop that is not safe.

Keep the Super Informed

When weather delays a route, tell your construction customers. A quick text to supers on the affected sites, sent from the office through two-way texting, heads off frustrated calls. Automatic on-the-way and arrived texts still go out when the driver does reach the site, so supers know the service happened.

Billing in Winter

Rental tracking keeps counting days whether it is snowing or not. Extra days past the days included are added to the invoice automatically. If your company charges differently in winter, such as a cold-weather service fee, set it up on your service list and add it to the jobs it applies to.

Winter is when contractors find out which vendors are reliable. Those who keep service steady through the cold earn loyalty for the spring rush. To see how routing, notes and texting fit together, visit PortaPottyBossPro construction porta potty rental software.

Keep Winter Construction Routes on Track

Notes, skips with reasons and customer alerts in PortaPottyBossPro.

Start Free Trial
No credit card required  ·  14-day free trial  ·  from $59/mo after
Keywords: winter porta potty service construction, cold weather portable toilet service, construction site porta potty winter, freezing porta potty job site